Logistics Platform

Construction of an industrial concrete floor with coloured surface hardener. The project included sustainability measures to reduce energy consumption and manage waste, minimising the environmental impact. Abrasion and flatness tests were carried out to ensure the floor's durability and surface precision.

Année

Localisation

Taille

Projets Connexes

Parlons-en.

Le Groupe GR360 dispose d’une équipe de professionnels hautement qualifiés
qui s’engagent à offrir les meilleures solutions

Copyright © 2023 Grupo GR360 – Tous Droits Réservés