Automated Logistics Base

Design of a logistics base divided into two distinct volumetric elements. The construction process followed specific design requirements capable of supporting heavy loads, intense traffic, and strict operational parameters. A reinforced concrete flooring solution was used, as well as specific insulation components to ensure high temperature ranges.

Année

Localisation

Taille

Projets Connexes

Parlons-en.

Le Groupe GR360 dispose d’une équipe de professionnels hautement qualifiés
qui s’engagent à offrir les meilleures solutions

Copyright © 2023 Grupo GR360 – Tous Droits Réservés