Automated Logistics Base

Design of a logistics base divided into two distinct volumetric elements. The construction process followed specific design requirements capable of supporting heavy loads, intense traffic, and strict operational parameters. A reinforced concrete flooring solution was used, as well as specific insulation components to ensure high temperature ranges.

Year

Location

Dimension

Related Projects

Let's talk.

The GR360 Group has a team of highly qualified professionals
committed to offering the best solutions