Industrial Facility

Construction of a jointless shrinkage floor in polished concrete for a project by Garcia Garcia. Reinforced with steel fibres, the floor was built without traditional shrinkage joints, enhancing performance and reducing maintenance. The solution also included 400 linear metres of armour slide joints, allowing for efficient load distribution and increased durability over time.

Année

Localisation

Taille

Projets Connexes

Parlons-en.

Le Groupe GR360 dispose d’une équipe de professionnels hautement qualifiés
qui s’engagent à offrir les meilleures solutions

Copyright © 2023 Grupo GR360 – Tous Droits Réservés