Industrial Facility

Construction of a jointless shrinkage floor in polished concrete for a project by Garcia Garcia. Reinforced with steel fibres, the floor was built without traditional shrinkage joints, enhancing performance and reducing maintenance. The solution also included 400 linear metres of armour slide joints, allowing for efficient load distribution and increased durability over time.

Year

Location

Dimension

Related Projects

Let's talk.

The GR360 Group has a team of highly qualified professionals
committed to offering the best solutions