Automated Logistics Base

Design of a logistics base divided into two distinct volumetric elements. The construction process followed specific design requirements capable of supporting heavy loads, intense traffic, and strict operational parameters. A reinforced concrete flooring solution was used, as well as specific insulation components to ensure high temperature ranges.